Annual output of Zhejiang Yiya New Materials Co., Ltd. 2000 Thousands of square meters of environmentally friendly car body spray-painting film, 3800 10,000 square meters high viscosity and weather resistance PVC Environmental impact report for the adhesive film reconstruction project Environmental Impact Assessment Information Disclosure
1. Name and summary of construction project
project name: annual output 2000 Thousands of square meters of environmentally friendly car body spray-painting film, 3800 10,000 square meters high viscosity and weather resistance PVC Adhesive film reconstruction project
Construction unit: Zhejiang Yiya New Materials Co., Ltd.
Construction nature: remodel
Construction location: Zhejiang Province Jiaxing City Guangming Road, Tongxiang Economic Development Zone 1367 Number
Investment: 2300 Ten thousand yuan
Production system: No new employees will be added to the project, and a three-shift system will be implemented 24h hours of production, years of work 300 sky.
Total investment and economic benefits : project total investment 2300 Ten thousand yuan, estimated annual output value 31300 Ten thousand yuan, profit 2660 Ten thousand yuan, tax 950 Ten thousand yuan.
Planning construction progress : Book The project is expected to be 202 5 Year 12 It will be put into operation every month.
Construction content and scale : The total investment of this project 2300 Ten thousand yuan, using the company's existing land and factory buildings to eliminate the coating system 1 sets, exhaust gas treatment devices 1 sets, air compressors 1 station, retain coating system 1 Sets and slitting machines 8 Taiwan, rewinding machine 1 Table, punching machine 2 Taiwan, air compressor 1 Taiwan, newly purchased high-speed coating machine 2 Table and mold temperature machine 2 Taiwan, hot melt adhesive coating machine 1 Table, punching machine 5 Taiwan, air compressor 1 Taiwan, activated carbon exhaust gas treatment device 1 set, RTO Exhaust gas treatment facilities (including waste heat recovery boiler) 1 Set, high speed disperser 2 Table, cylinder 6 Taiwan and other related equipment, forming an annual output 2000 Thousands of square meters of environmentally friendly car body spray-painting film, 3800 Tens of thousands square meters of high viscosity and weather resistance PVC Adhesive film. Estimated annual output value 31300 Ten thousand yuan, profit 2660 Ten thousand yuan, tax 950 Ten thousand yuan.
2. Distribution of sensitive targets in major links around the project
This project is implemented in the factory area of the enterprise, which is located in Zhejiang Province Jiaxing City Guangming Road, Tongxiang Economic Development Zone 1367 Number , the distribution of main sensitive points around is shown in the table 1 .
surface 1 project Summary list of major environmental protection goals in the assessment area
Serial number |
Protection target name |
Coordinate / Latitude and longitude |
Protected objects |
Protect content |
Environmental functional area |
Position |
Relative factory boundary distance |
|
Longitude ° |
Latitude ° |
|||||||
1 |
Tongnan Community |
120.549082 |
30.605202 |
Resident |
~ 5480 people |
Ambient Air Class II |
Northeast |
700m |
2 |
Anle Village |
120.558739 |
30.609278 |
Resident |
~ 23000 people |
Northeast |
1678m |
|
3 |
Phoenix Community |
120.564638 |
30.622668 |
Resident |
~13319 people |
Northeast |
3100m |
|
4 |
Baile Community |
120.558749 |
30.619377 |
Resident |
~3285 people |
Northeast |
2500m |
|
5 |
Revitalize community |
120.540937 |
30.620501 |
Resident |
~3103 people |
North |
2172m |
|
6 |
Huannan Community |
120.529312 |
30.618522 |
Resident |
~7850 people |
North |
1702m |
|
7 |
Sangyuanqiao Village |
120.550909 |
30.587210 |
Resident |
~2750 people |
Southeast |
1468m |
|
8 |
Momofuku Village |
120.568204 |
30.593647 |
Resident |
~2387 people |
East |
2500m |
|
9 |
Shiqiao Village |
120.546521 |
30.581835 |
Resident |
~3296 people |
Southeast |
2600m |
|
10 |
Lingan Village |
120.526523 |
30.596647 |
Resident |
~4817 people |
West |
1700m |
|
11 |
Lijialong Village |
120.523029 |
30.594502 |
Resident |
~3508 people |
Southwest |
2500m |
|
12 |
Changxincun |
120.546714 |
30.581878 |
Resident |
~4000 people |
Southeast |
1712m |
|
13 |
Zhongshan Village |
120.531680 |
30.627137 |
Resident |
~2537 people |
Northwest |
1700m |
|
1 4 |
Tongxiang People's Primary School |
120.558637 |
30.607045 |
School |
~7000 people |
Northeast |
1560m |
|
1 5 |
Tongxiang City Qixin School |
120.561426 |
30.607034 |
School |
~ 5430 people |
Northeast |
1812m |
|
1 6 |
Tongxiang Fengming Tiannu Primary School (Phoenix Campus) |
120.532776 |
30.616369 |
School |
~ 5430 people |
Northwest |
2400m |
|
17 |
Tongxiang Economic and Technological development zone Tube committee |
120.547752 |
30.604942 |
Government agencies |
About 100 people |
Northeast |
585m |
|
18 |
Kangjingtang |
/ |
/ |
Surface water body |
/ |
Surface water Ⅲ kind |
West |
188m |
19 |
Soil |
/ |
/ |
/ |
Soil environment |
Soil screening value for the second type of land |
All around |
200m |
20 |
Groundwater |
/ |
/ |
/ |
Groundwater environment |
Groundwater Ⅲ kind |
All around |
/ |
3. Overview of the possible impacts of the project on the environment
1. Water Environment
Technical transformation post-corporate Discharge domestic sewage, boiler concentrated drainage, pure water preparation concentrated water, steam condensation water, and cooling circulating water drainage. Among them, boiler concentrated drainage, pure water preparation concentrated water, steam condensation water, and cooling circulating water are relatively clean and can be directly included in municipal sewage after collection. Pipe Network, domestic sewage via septic tank The pretreatment reaches the "Comprehensive Wastewater Discharge Standard" ( GB8978-1996 ) Level 3 Standards and "Indirect Discharge Limits of Nitrogen and Phosphorus Pollutants in Wastewater from Industrial Enterprises" ( DB33/887-2013 ) standard, included in the municipal sewage pipe network, Depend on Tongxiang City Shenhe Water Affairs deal with limited liability company set medium processing , Tailwater discharge qiantang river .
Therefore, after the technical transformation, the corporate wastewater will not have an adverse impact on the pollution load and normal operation of the sewage treatment plant, and will have little impact on the surface water bodies in the area.
2. Ambient air
After the implementation of the technical transformation project, the breathing exhaust gas from the cylinder and the exhaust gas from the oven were collected. RTO After device processing and RTO combustion smoke set up 15 m high exhaust stack DA00 1 emission , exhaust gas Able to meet the "Comprehensive Emission Standards for Air Pollutants" ( GB16297-1996 ) Secondary standard emission standards for new pollution sources in ( Among them, the organic waste gas factor refers to the "Emission Standard of Air Pollutants for Industrial Painting Processes" ( DB33/2146 — 2018 )surface 1 Limit requirements ). After the implementation of the technical transformation project Exhaust gas from the glue temporary storage room, exhaust gas from the glue dispensing room, exhaust gas from the glue application head, and exhaust gas from the lower parts at the tail of the machine Collect via zeolite wheel After catalytic combustion treatment set up 15 m high exhaust stack DA00 2 emission , exhaust gas Able to meet the "Comprehensive Emission Standards for Air Pollutants" ( GB16297-1996 ) Secondary standard emission standards for new pollution sources in ( Among them, the organic waste gas factor refers to the "Emission Standard of Air Pollutants for Industrial Painting Processes" ( DB33/2146 — 2018 )surface 1 Limit requirements ) ; Hot melt adhesive waste gas is collected and treated with two-stage activated carbon. 15m high exhaust stack DA003 emissions, exhaust gas Able to meet the "Comprehensive Emission Standards for Air Pollutants" ( GB16297-1996 ) Secondary standard emission standards for new pollution sources in ( Among them, the organic waste gas factor refers to the "Emission Standard of Air Pollutants for Industrial Painting Processes" ( DB33/2146 — 2018 )surface 1 Limit requirements ) .
It is predicted that technological transformation New pollution sources added to the project will be discharged under normal conditions , Maximum hourly concentration and maximum standard share of short-term concentration contribution of each pollution factor ≤ 100% ; Methanol, toluene, ethyl acetate , non-methane total hydrocarbons Overlay current mass concentration , intended to replace pollution sources, The environmental protection objectives behind the proposed pollution sources under construction and the short-term concentration of the grid maximum point guarantee rate all meet the corresponding environmental quality standards. , The environmental impact meets the requirements of environmental functional zoning objectives. Technical transformation The short-term contribution concentration of all pollution sources in the project to air pollutants outside the factory boundary meets the environmental quality concentration limit, so there is no need to set an atmospheric environment protection distance at the factory boundary. The impact of technical transformation projects on the regional atmospheric environment is acceptable.
Also, Abnormal working conditions Various pollutants Hourly maximum contribution value concentration can reach environmental quality standard limits, but will result in a greater increase in the surrounding contribution concentration . This environmental impact assessment requires enterprises to regularly maintain and repair waste gas treatment devices in a timely manner to ensure waste gas removal efficiency and reduce the risk of pollution to the surrounding environment.
3. Acoustic environment
Technical transformation project After completion, after each noise source has been treated with noise reduction, the prediction results show that the day and night predicted values of each factory boundary of the project comply with the "Environmental Noise Emission Standard for Industrial Enterprises at Factory Boundaries" ( GB12348-2008 )middle 3 kind The requirements of standard limits generally will not have obvious adverse effects on the quality of the surrounding acoustic environment.
4. Solid waste
Technical transformation project After implementation General waste packaging , waste scraps, waste ion exchange resin , Waste hot melt adhesive The sales materials recycling department recycles and utilizes comprehensively, Hazardous waste packaging, Waste glue , Waste cleaning fluid , Waste filter element, waste gloves, waste PTFE pipe, waste mineral oil, waste oil barrel, waste zeolite, waste catalyst, waste activated carbon Entrust a unit with hazardous waste disposal qualifications to receive and dispose of hazardous waste. Technical transformation project After implementation All solid waste generated has a reasonable and feasible disposal destination. As long as the construction unit strictly carries out classified collection and the storage place is designed and constructed in strict accordance with relevant regulations, good The "four prevention" requirements (windproof, rainproof, sunproof, and leakproof) are based on the basic principles of "reduction, resource utilization, and harmlessness" , on the basis of strengthening its own utilization, carry out reasonable disposal in accordance with regulations, Technical transformation The solid waste of the project will not have any adverse impact on the surrounding environment.
4. Main countermeasures and measures to prevent and mitigate adverse environmental impacts
The pollution prevention and control measures for this project are shown in the table 2 .
Surface 2 List of pollution prevention and control measures for this project
Project |
Pollutant name |
Pollution prevention and control measures for this project |
Expected governance effects |
Exhaust gas |
Cylinder breathing exhaust gas, oven exhaust gas |
After exhaust gas collection RTO After device processing and RTO Combustion smoke equipment 15m high exhaust stack DA001 emission , Cylinder breathing exhaust gas The collection efficiency is no less than 90 % , The oven exhaust gas collection efficiency is not less than 99% , The purification efficiency is not less than 99 % |
Meet the "Comprehensive Emission Standards for Air Pollutants" ( GB16297-1996 ) in table 2 (The organic waste gas factor refers to the "Emission Standard of Air Pollutants for Industrial Painting Processes" ( DB33/2146 — 2018 )surface 1 limit requirements) , "Odor Pollutant Emission Standards" ( GB14554-93 )surface 2 standard requirement |
Combustion smoke |
After collection set up 15m Exhaust pipe high altitude discharge |
||
Exhaust gas from the glue temporary storage room, exhaust gas from the glue dispensing room, exhaust gas from the glue application head, and exhaust gas from the lower parts at the tail of the machine |
Exhaust gas collected through zeolite runner Catalytic combustion treatment post-equipment 15m high exhaust stack DA002 , exhaust gas The collection efficiency is no less than 90 % , combination The purification efficiency is not less than 90 % |
Meet the "Comprehensive Emission Standards for Air Pollutants" ( GB16297-1996 ) in table 2 (The organic waste gas factor refers to the "Emission Standard of Air Pollutants for Industrial Painting Processes" ( DB33/2146 — 2018 )surface 1 limit requirements) , "Odor Pollutant Emission Standards" ( GB14554-93 )surface 2 standard requirement |
|
Hot melt adhesive exhaust gas |
Exhaust gas collection Two-stage activated carbon Processing metadata 15m high exhaust stack DA002 , exhaust gas The collection efficiency is no less than 90 % , exhaust gas The purification efficiency is not less than 85 % |
Meet the "Comprehensive Emission Standards for Air Pollutants" ( GB16297-1996 ) in table 2 (The organic waste gas factor refers to the "Emission Standard of Air Pollutants for Industrial Painting Processes" ( DB33/2146 — 2018 )surface 1 limit requirements) , "Odor Pollutant Emission Standards" ( GB14554-93 )surface 2 standard requirement |
|
VOCs Unorganized emission control requirements |
( 1 ) Strengthen the collection of waste gas and connect it to the waste gas treatment system to reduce VOCs Fugitive emissions; ( 2 ) The time limit for establishing a ledger shall not be less than 3 Year; ( 3 ) Production workshops should design reasonable ventilation volume in accordance with relevant ventilation design specifications and other requirements on the premise of complying with relevant regulations on production safety and occupational health. ( 4 ) Strengthen inspections of production facilities, deal with leaks in a timely manner if leaks are found, and reduce installation areas as much as possible " running, popping, dripping " Phenomenon. |
Within the factory area VOCs Unorganized emissions meet the "Unorganized Emission Control Standards for Volatile Organic Compounds" ( GB37822-2019 )appendix A special emission limits |
|
Wastewater |
Comprehensive wastewater |
The project boiler concentrated drainage water, pure water preparation concentrated water, steam condensate water, and cooling circulating water are relatively clean and can be directly collected into the municipal sewage pipe network. Domestic sewage passes through the septic tank. |
The discharge of wastewater from connected pipes shall comply with the "Comprehensive Wastewater Discharge Standard" ( GB8978-1996 )surface 4 Intermediate level 3 standard, among which NH 3 -N , the total phosphorus takeover standard implements the "Indirect Discharge Limits of Nitrogen and Phosphorus Pollutants in Wastewater from Industrial Enterprises" ( DB33/887-2013 ) |
Noise |
Equipment operating noise |
1 2. Carry out a scientific and reasonable overall layout. High-noise power equipment should be centralized and arranged as far away from the factory boundary as possible, and low-noise equipment should be given priority. 2. For power equipment with high noise sources, on the basis of taking necessary vibration reduction, sound insulation, silencing and other measures, strengthen daily inspection and maintenance work to ensure the normal operation of the equipment. 3. Use medium-hardness rubber and other vibration isolation materials with high allowable stress to damp the operating vibration of mechanical equipment, which can reduce the intensity of noise sources, extend the service life of equipment, and ensure the continuity of production. 4. Strengthen the greening around the factory area, set up a green isolation belt of a certain width, plant a wide range of flowers, plants and trees, and build ecological barriers to absorb and reduce noise. |
factory boundary Meet the "Environmental Noise Emission Standards at the Boundary of Industrial Enterprises" ( GB12348-2008 ) 3 class standard |
Solid Waste |
Hazardous waste packaging, waste glue, waste cleaning fluid, waste filter element, waste gloves, waste PTFE pipe, waste mineral oil, waste oil barrels, waste zeolite, waste catalyst, waste activated carbon Entrust qualified units for disposal; General waste packaging, waste scraps, waste ion exchange resin, waste hot melt adhesive After collection, it will be comprehensively utilized by the material recycling department. |
Does not affect the local environment and prevent secondary pollution |
|
Soil and groundwater pollution prevention and control |
1. It is necessary to effectively divert rainwater and sewage, clean sewage, and prevent settlement of pipelines to avoid sewage leakage. 2 2. Carry out anti-corrosion and anti-seepage treatment on the ground in key areas to prevent leaks or fire-fighting wastewater from overflowing into the external environment during accidents. 3. All kinds of solid waste (especially Hazardous Waste ) must be handled strictly in accordance with relevant requirements, Hazardous Waste The temporary storage warehouse must comply with the "Hazardous Waste Storage Pollution Control Standards" ( GB3597-2023 ) is implemented; all hazardous waste must be stored in containers, and the containers should be covered and sealed. The storage ground must be hardened, anti-corrosion and anti-seepage, and can collect ground flushing water, and be equipped with rainproof facilities; general solid waste must be in accordance with "General Industrial Solid Waste" Storage and Landfill Pollution Control Standards" ( GB18599-2020 )store. 4 2. Do a good job in accident safety and minimize environmental risk accidents caused by pollutant leakage. Take measures to intercept materials and fire-fighting wastewater in the event of risk accidents (such as leakage, fire, explosion, etc.). . |
Meet relevant regulatory requirements |
|
Risk prevention measures |
1. Carry out ground anti-corrosion, anti-seepage and interception measures in key areas; 2. Enterprises should establish an environmental protection leading group, establish environmental protection rules and regulations, environmental protection files, and operation management ledgers; 3. Strengthen the operation and management of waste gas treatment facilities, regularly maintain and repair waste gas collection and treatment facilities, keep them in normal operation, and prevent accidental emissions; |
Reduce the risk of environmental accidents |
5. Basic conclusions of environmental impact assessment
Annual output of Zhejiang Yiya New Materials Co., Ltd. 2000 Thousands of square meters of environmentally friendly car body spray-painting film, 3800 Tens of thousands square meters of high viscosity and weather resistance PVC Adhesive film reconstruction project lie in Guangming Road, Tongxiang Economic Development Zone 1367 Number . Technical transformation The project complies with Township city "Three lines and one order" students Ecological environment zoning management and control plan requirements, can meet the pollutant emission standards stipulated by the country and the province, meet the total emission control indicators of major pollutants stipulated by the country and the province, meet the environmental quality requirements determined by the environmental function zone where the project is located, and meet the requirements of environmental risk prevention measures. . Therefore, from the perspective of environmental protection, the implementation of the project is feasible .
6. Scope and main matters of soliciting public opinions
1. Scope
Mainly targeting residents, enterprises and institutions surrounding the project construction site.
2 . Main matters
( 1 ) Opinions or views on the current environmental quality of the region
( 2 ) views on corporate environmental protection behavior
( 3 ) Opinions, views or requirements on the construction project
( 4 ) Requirements or opinions on the environmental protection work of local governments and relevant departments
7. Method and time of disclosure
This announcement will be made in the form of on-site posting on publicity boards in communities, streets and other units and in the form of website publishing.
At the time of public announcement between: 202 4 Year 5 moon 15 day ~202 4 Year 5 moon 29 day.
8. Specific forms for public opinions
public ( individual or group ) From the date of this announcement 10 Within working days ( 202 4 Year 5 moon 15 day ~202 4 Year 5 moon 29 date) by letter, phone or other means To contact the construction unit, environmental assessment unit, and environmental protection department, it is recommended that the group unit affix an official seal, and the individual should name and provide contact information. If the public needs additional relevant information, please contact the environmental assessment unit during the publicity period. The environmental impact assessment unit will truly record the public's opinions and suggestions in the Environmental Impact Report, and reflect the public's valuable opinions and suggestions to the construction unit, design unit and relevant departments of the project.
( 1 ) Name and contact information of the construction unit
Construction unit: Zhejiang Yiya New Materials Co., Ltd.
address: Guangming Road, Tongxiang Economic Development Zone, Jiaxing City, Zhejiang Province 1367 Number
Contact person: Xu Min
contact number:
( 2 ) Name and contact information of environmental impact assessment agency
Environmental impact assessment unit: Hangzhou Xianglong Environmental Protection Technology Co., Ltd.
address: Hangxing Road, Gongshu District, Hangzhou City 708 Symbol Star Innovation Center 2 building 408 room
Contact person: Chen Gong
contact number: 15700084827
( 3 ) Approval department name and contact information
Unit name: Jiaxing Municipal Ecological Environment Bureau Tongxiang branch
Unit Address: Kangmin East Road, Tongxiang City, Jiaxing City, Zhejiang Province 58 Number
contact number: 0573-88061994
[ Note ] : The public is requested to provide detailed contact information as much as possible when expressing opinions.
Announcement issuing unit: Zhejiang Yiya New Materials Co., Ltd.
Release date: 202 Four Year five moon fifteen Day